It’s an exciting project to remodel a master bathroom, especially if you want to turn your area into a luxurious hideaway. One of the most often asked questions from homeowners in Atlanta is, “How long will it take to remodel my master bathroom?” Knowing how long a job like this will take will help you plan more efficiently and have reasonable expectations. We’ll break down the common steps of an Atlanta master bathroom redesign in this blog post, giving you a thorough guide to help you through this life-changing process. We’ll cover everything you need to know to make sure your makeover goes smoothly and stays on time, from early planning and design to final inspections and touch-ups.

Beautiful Subway tile master bathroom

1-2 weeks for Planning and Designing

Planning and design are the first steps in any remodeling project. Choosing materials, determining the
layout, and collaborating with a contractor or designer to produce a thorough plan are all part of this
phase. Depending on the complexity of your design, this stage usually takes 1-2 weeks in Atlanta.

1-3 Weeks for Permits and Approvals

The extent of your remodel may need you to apply for permits from the local municipal authorities. This
process may take one to three weeks to complete. Although the paperwork will often be handled by
your contractor, it is important to account for this time when planning your project.

Demo: One to three days

After obtaining the necessary licenses and planning, the real work starts with demolition. In this phase,
outdated fixtures, tiles, and any other components that will be changed are taken out. Depending on the
size of your bathroom and the amount of work involved, demolition usually takes one to three days.

3–5 Days for Plumbing and Electrical Work

It is necessary to replace the electrical and plumbing systems after demolition . Making sure your new
fixtures and appliances work properly is dependent on this step. Electrical and plumbing work typically
takes three to five day.

Drywall and Framing: 2-4 Days

Installing new framing and drywall comes after the electrical and plumbing systems are set up.
Depending on the size of the bathroom and the intricacy of the design, this stage often takes two to four
days.

Installation of Flooring: 2-4 Days

One major component of the renovation is the installation of new flooring. This step usually takes two to
four days, depending on the material you choose—tiles, hardwood, or something else entirely.

Installation of Vanity and Cabinets:

Your master bathroom can be made to appear and operate completely different with new cabinets and
vanities. These components typically take one to three days to install, but can take longer for countertop
installation.

Tile Installation: 3–7 Days

When remodeling a bathroom, tile work can be one of the more time-consuming tasks, particularly if
you select complex designs. It usually takes 3–7 days at this point.


2–3 days for painting and finishing

Painting and final details come next after the main components are installed. Painting the walls, putting
in trim, and other finishing touches take two to three days on average during this phase.

Installing fixtures (toilets, sinks, showers, etc.) takes one to two days.

The installation of new fixtures, like sinks, showers, and toilets, is the last stage of your Atlanta master
bath renovation. Usually, this stage takes one or two days.

Final Inspections and Touch-Ups: One to two days

It’s imperative to perform final inspections and touch-ups before you can start enjoying your new master
bathroom. Touch-ups and final inspections often take one to two days.

A typical Atlanta master bathroom renovation could take three to six weeks, provided there are no major
setbacks or issues. On the other hand, larger, specialized projects or remodels may require more time,
possibly up to eight or twelve weeks. You can make sure that your renovation project stays on schedule
and lives up to your expectations by being aware of every step of the process and working with
knowledgeable professionals. Here at InDesign, We are proud to be one of the leading bathroom
remodeling contractors in our area, with extensive years of experience in this field. We have been
working hard to become one of the best bathroom contractors in Alpharetta and surrounding areas, and
we are always looking to improve and expand our services.

We know that when it comes to Atlanta bathroom renovations, there are plenty of options out
there—but we’re confident that we can offer exactly what you need. Our team will help you plan your
project and make sure that it’s completed on time and within budget.
The bathroom is often the one place in your home where you can enjoy some privacy, spend a little extra
time getting ready for the day ahead, or end your day in a spa-like, relaxing environment. Our designers
can help you create the perfect or ideal bathroom design of your dreams that will increase the value of
your home, as well as your day-to-day comfort.

Our kitchen and bath showroom is located in Johns Creek near Alpharetta and Milton, Georgia, and we
provide kitchen and bathroom design and remodeling services for all Metro Atlanta (Alpharetta, Johns

Creek, Atlanta, Buckhead, Buford, Cumming, Duluth, Dunwoody, East Cobb, Kennesaw, Marietta, Milton,
Norcross, Peachtree Corners, Roswell, Sandy Springs, Smyrna, Sugar Hill, Suwanee, Vinings and more!)
Our kitchen and bath flagship showroom is located just 15 miles north of Atlanta, at the border of
Alpharetta and Johns Creek.